top of page
TAWFIK MAHMOUD

building construction and materials
PROJECT ONE
PROJECT TWO
.png)






For project one we worked in a group of seven to research the materials used in the construction of the Tun Razak Exchange mall. Their unique properties and why they were selected for each specific construction.
Project 2 was made individually. It was integrated with Architectural design 2. We had to research about how to construct our project and the specific materials to be used. Then to draw a detailed construction section and specific construction details and also make a model.


bottom of page